com.open-factory/open-factory
up checked
Unclaimed · Unverified
Agent searches it appeared in, last 30 days: 0. Run this server? Claim the listing: verified label, uptime alerts and analytics.
Publisher-provided title
Open Factory
Publisher-provided description
Lead times, prices, tariffs and grid interconnection terms for factory and datacenter equipment.
Summary by lookupd
Provides lead times, equipment prices, tariff rates and utility interconnection terms for factory and datacenter electrical gear, plus…
Install
Claude Code, remote (streamable-http)
claude mcp add --transport http open-factory https://open-factory.com/mcp
Codex, remote (streamable-http)
codex mcp add open-factory --url https://open-factory.com/mcp
Cursor, remote (streamable-http) → .cursor/mcp.json
{
"mcpServers": {
"open-factory": {
"url": "https://open-factory.com/mcp"
}
}
}Other clients: docs. Or tell your agent: Set up lookupd for me: read https://lookupd.com/agent.md and follow it.
Tools (12 tools)
Publisher-provided text
search_articlesSearch Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with slug, URL, date, pillar, summary and the CSV figet_articleFull metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text upget_index_readingsThe current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its soget_lead_timesCurrent published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, ATget_price_bandsTransaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25,get_tariff_ratesUS import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin couget_large_load_termsWhat a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, exget_book_to_billLatest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Schget_disclosure_scorecardWhether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partiaget_recordEvery dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and thlist_datasetsThe CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tarifget_tool_dataThe source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedu
Details
- Version: 1.0.0
- Transports: streamable-http
- Uptime (7 days): 100%
- Median latency: 279 ms
- First indexed:
- Last seen in registry:
- Website: https://open-factory.com/developers/
Badge for your README
Shows this live status and links here; updates hourly.
[](https://lookupd.com/servers/com.open-factory/open-factory)
- 62071 servers
- Last crawl: 2026-11-11T16:17:25.167Z
- API base:
https://api.lookupd.com - MCP URL:
https://api.lookupd.com/mcp